Monday, August 17, 2009

The sheds finished... well almost.

The personal access door is finally finished with the lock fitted, at the moment the door can only be opened and closed from the inside, I haven't decided yet if I want to extend the lock to the outside.

The gutter at the rear of the shed is now up as well so that completes the roof, I only need to attach some temporary drain pipes to the gutters until i can get my water tank.

Council have done their inspections and all is good so the shed has passed!

The only shed related work to be done now is to put the windows in (these weren't required for the inspection as they are not deemed part of the sheds structural design.)

I haven't had a chance to post much between being slack and other commitments, however I have been doing some things with relation to the shed, though not at the shed.

I have purchased a solar Panel, charger and battery as I wont be connecting mains power just yet. I have to build a bracket for the solar panel so I can mount it on the roof I am also making it adjustable for seasonal sunshine, more on that later.

Picture of the finished personal access door.
The door from the inside.

The guttering at the rear of the shed.