I got some of the plumbing done, the pipes for the tap and the waste water will be done when the cabinets are installed.
The finished kitchen cabinets...
The final part for the kitchen is a movable cabinet that will house a small 3-way fridge, hopefully the cabinet will sit the same height as the main cabinet when its on its wheels, why wheels? So i can roll it out next to the BBQ and have extra bench space for preparations and cold drinks available at hand.
Sunday, December 6, 2009
5 December 2009
The wall cabinets finally get a coat of paint, once the doors are back on they'll be finished.
Saturday, December 5, 2009
28 November 2009
Shellaced and polished the bench top, varnished the doors, this caused them to be darker then the bench top, I would have preferred it to come out with a darker bench top but it looks ok.
I fixed the gap that was caused by the drawer, looks much better now.
I fixed the gap that was caused by the drawer, looks much better now.
Finished the doors on the wall cabinets, I just need to paint the cabinets themselves, also put all the handles on, there a bit 60's but do the job. In this photo you can see the fixed drawer.
Subscribe to:
Posts (Atom)