Sunday, December 6, 2009

5 December 2009

The wall cabinets finally get a coat of paint, once the doors are back on they'll be finished.

I got some of the plumbing done, the pipes for the tap and the waste water will be done when the cabinets are installed.

The finished kitchen cabinets...

The final part for the kitchen is a movable cabinet that will house a small 3-way fridge, hopefully the cabinet will sit the same height as the main cabinet when its on its wheels, why wheels? So i can roll it out next to the BBQ and have extra bench space for preparations and cold drinks available at hand.

No comments:

Post a Comment